At least annually, all foam systems shall be thoroughly inspected and checked for proper operation in accordance with NFPA 1911, Standard for the Inspection, Maintenance, Testing, and Retirement of In-Service Emergency Vehicles, 2017 Edition, Chapters 23 & 24. The inspection shall include performance evaluation of the foam concentrate or premix solution quality or both. Test results that deviate more than 10 percent from those recorded in acceptance testing shall be discussed immediately with the manufacturer. The goal of this inspection and testing shall be to ensure that the system is in full operating condition and that it remains in that condition until the next inspection.

 

CAF Systems are also tested in accordance with NFPA 1911.

Copyright 2017, FireOne

FOAM TESTING

Home Page

Fire Hose Testing

Fire Pump Testing

Ground Ladder Testing

Manifold, Appliance & Nozzle Testing

Aerial Ladder Testing

Foam Testing

Links

Contact FireOne

One Meridian Plaza